top of page

Industry & Science

Services​
​

LEEAD Consulting is highly involved in Industry & Sciences, offering solutions for:
Industrial Buildings, Distribution Centers, Warehouses, Industrial Toxic Waste Collection, Solid Waste, Pharmaceuticals & Laboratories

Select a Market Sector:

Architectural Design & Planning

​• Conceptual Designs

• Project Identification, Studies & Surveys
• Preliminary Study
• Design Development
• Tender Documentation
• Detail Design Elaboration
• Final Designs
• Elaboration of Tender Documents
• Interior Design
• Construction Drawings
• Construction Supervision
• Technical Assistance during Construction
• Environmental Assessments
• Staff Training  Transfer of Know-how
• Commissioning and trial operation of works

Structural Engineering
• Feasibility Studies
• Procurement
• Commissioning
• Project Budgeting
• Operation & Maintenance Planning
• Auditing & Due Diligence
• Project Management

Mechanical & Electrical Engineering​

• HVAC, Plumbing & Irrigation
• Fire Protection
• Electrical (Power, Lighting, Ultra low voltage)
• People Conveying Systems
• Lightning Protection (earthing)

• Security Systems & Building Controls​

​Featured Project

Sato’s new Distribution Centre was constructed in Elefsina’s industrial area. The plot occupies an area of 55,500m². In terms of functionality, morphology and construction it is divided in three parts: the central warehouse, the area dedicated to goods’ pick-up and shipment and the independent office building. The Central Warehouse, covering an area of 15,800m², has a fully automated VNA storage system. The Pick-Up and Delivery Area occupies three floors, each having a surface of 5,250m². The underground floor is dedicated to storage and is equipped with a ramp for large trucks. It also houses the electrical and mechanical infrastructure. On the ground floor there are 32 hydraulic ramps for loading and unloading purposes. The Office Building develops across four floors, 650m² each. The canteen, the restaurant, the assembly room and the archive are found on the underground level. The main entrance is located on the ground floor, complemented by delivery and pick-up offices on both sides. The first and second floors are occupied by offices. This building is morphologically differentiated from the other two, by the louvers on its south facade.

The project was a 50% in collaboration with ArchLab S.A.

SATO Distribution Center

Central Warehouse, Goods Pick-up & Offices, Greece

Architectural Design

Other Markets

​Data Centres & Logistics
bottom of page